Skip to content
Go to app

Create a task

Create a task

A new task is created via the Create new task form. There you choose the task type, set the period and priority, assign employees and vineyards, and optionally add a description, custom fields and equipment.

The creation form for new tasks with task type, the Scheduling, Team and Vineyards sections and the optional fields.

  1. Open the tasks page

    In the sidebar, navigate to Tasks. You’ll see your existing campaigns in the task overview.

  2. Click Create

    Click Create task in the top right. The Create new task form opens.

  3. Select the task type

    At the very top, select the appropriate task type (e.g. pruning, canopy work, harvest). As long as no type is selected, the hint Select a task type to continue is shown — the remaining sections only appear afterwards, and Save stays disabled.

    The task type determines which additional fields are available under Additional data. If a type is missing, the Manage task types link takes you straight to the settings. More on this under Task types.

  4. Set the scheduling (Scheduling section)

    Choose in the toggle between Planned and Retroactive:

    • Planned — Optionally enter a planned start date and a planned completion date, and choose a priority.
    • Retroactive — Record work that has already been done, using Completed on plus From and Until.
  5. Assign employees and a task lead (Team section)

    Assign employees by entering names or selecting an employee group. Then choose a task lead — this is a mandatory field and can only be filled once at least one employee is assigned.

  6. Assign vineyards (Vineyards section)

    Click Select vineyards and choose the vineyards in which the work is to be carried out. The selected vineyards appear underneath as the Work sequence list — its order determines the sequence in which the vineyards are worked through.

  7. Fill in the optional fields

    Below the Optional fields divider you’ll find three expandable areas:

    • Description — Free text for special instructions or notes (Enter description here).
    • Additional data — Custom fields of the selected task type (e.g. Litres applied, Kilograms harvested) via Add field….
    • Machinery & equipmentMachinery & equipment needed for the work.
  8. Save

    Click Save. Vinitor creates one task per selected vineyard and bundles them into a campaign. The tasks start with the status Upcoming — for a Retroactive entry, directly with Done.

FieldRequiredDescription
Task typeYesDetermines the category and available additional fields
Planned start dateNoPlanned start of the work
Planned completion dateNoPlanned end of the work
PriorityNoSix levels from Very High Priority to No Priority (default: No Priority)
EmployeesNoIndividual employees or groups who carry out the work
Task leadYesPerson responsible — must be chosen from the assigned employees
VineyardsYesOne or more vineyards — one task is created per vineyard
DescriptionNoFree-text description with instructions or notes
Additional dataNoCustom fields depending on the task type
Machinery & equipmentNoAssigned equipment and machinery
PriorityUse
Very High PriorityHighest urgency — takes precedence over everything else
High PriorityUrgent — requires immediate attention
Medium PriorityShould be done soon
Low PriorityCan wait, but shouldn’t be forgotten
Very Low PriorityOnly when there is spare capacity
No PriorityDefault value — no particular urgency

The priority can be changed at any time afterwards — on the task detail page, in the cell popover of the task table, or in bulk for several vineyards via the action bar of an expanded campaign.

Select a single vineyard from the list. The campaign then contains exactly one task, and the location is shown on the map in the detail view.

Use the Retroactive toggle in the Scheduling section to record work after the fact. This is useful when work has already been done but hasn’t yet been documented in the system.

For a retroactive entry, all tasks in the campaign are created directly with the status Done. The recorded time span between From and Until is distributed across the vineyards in proportion to their vine area.

Besides the creation form there are two shortcuts:

  • Cell popover of the task table — Click an empty cell in the campaign matrix and create a task there directly with Target date, Employees and Description.
  • Add vineyard — Use the menu of a campaign to take on further vineyards; one new task is created per vineyard within the same campaign.

SUPPORT

Need help?

Our team is happy to help with any questions about Vinitor.

Available Mon–Fri, 8am–5pm